This surface mounted MYMESH-CESR can be mounted directly onto solid ceilings or onto a range of different mounting boxes. Configurable for any room occupancy style, via the Mymesh App.
MYMESH-CESR is compatible with Mymesh commissioning tools.
To be installed by a competent person with reference to BS 7671 or equivalent local standards. If in doubt consult a qualified electrician.
• Plan where the MESH-CESR is to be located (see diagram 1). Switch off supply and check for hidden cables and pipes.
• The MYMESH-CESR should be connected as shown in diagram 2:
L – Live in. N – Neutral in.
• Knockout or drill the appropriate holes on the mounting plate for attaching the plate to the ceiling or back box (if applicable). Feed cables through
the appropriate (side or rear) entry hole. Screw the back mounting plate to the ceiling or backbox via the mounting holes. Wire the cables into the sensor head block terminal. Push the sensor head onto the mounting plate and align the side clips with the slots on the sensor heads.
On-the-fly (re) commissioning with a Mymesh BLE Gateway and Mymesh commissioning app for iPad
Connect to third-party back-office / Light Management system (LMS) via a Mymesh Ethernet Gateway
As of the first of April, our new address will be:
Oudeweg 115 B
2031 CC Haarlem
Reviews
There are no reviews yet.